fbpx

1215 Kline Place, Rahway, NJ

1215 Kline Place, Rahway, NJ

$500,000

Description

his New Construction Mother Daughter, built by DaSilva Homes has all of the modern conveniences, at an outrageously incredible price. Upon entering, gleaming hardwood floors welcome you with abundant natural lighting and thoughtfully curated designer finishes.  A chef’s kitchen, fully equipped with soft close white shaker cabinets, top of the line GE stainless steal appliances, and an expansive center island with breakfast bar is perfect for holidays. The whole family will enjoy the open flow layout. The master suite is a luxurious private retreat. Relax in your personal en-suite spa bath, with rainfall shower. The walk-in closet has custom shelving to organize all of your fashion accessories.  The ground floor is equipped with a full en-suite, kitchen and living area, and large patio. Minutes from Direct train to NYC.

Property Features

  • To be built in 2019;
  • Single Family Residential;
  • 2 story;
  • Style: Colonial Architecture.
  • 2,600 sq ft;

Appliances

    • CODetect,
    • Kitchen Exhaust Fan,
    • Microwave Oven,
    • Self Cleaning Oven,
    • Refrigerator,
    • Sump Pump,
    • Forced Hot Air,
    • Multi-Zon,
    • Central Air,
    • Multi-Zone Cooling
    • Jetted Tub,
    • Smoke Detector,
    • Stall Shower,
    • Walk-In Closet

Interior Amenities

    • 5 bedrooms;
    • 5.1 bathrooms
    • Breakfast Bar,
    • Center Island,
    • Eat-In Kitchen,
    • Pantry,
    • Separate Dining Area
    • Laundry room
    • Storage room
    • Utility room

Exterior Amenities

  • Thermal Windows/Doors,
  • Composition Siding,
  • 2 garage spaces,
  • Garage door opener

See the latest updates

1 June 18, 2017
latest-updates

  • The exterior siding and deluxe Azek Trim Package installation has begun

2 January 18, 2017
latest-updates

  • The exterior siding and deluxe Azek Trim Package installation has begun
  • The masons are finishing up the front and rear block for the stair treads

3 January 17, 2017
latest-updates

  • Temporary electrical pole installed
  • Trees are being cut down and removed from the property
  • House is being prepared for demolition.

4 April 11, 2017
latest-updates

  • The exterior siding and deluxe Azek Trim Package installation has begun
  • The masons are finishing up the front and rear block for the stair treads

See more properties